Brian Keller

Director of ALM Evangelism for Microsoft

Posts
  • Brian Keller

    Visual Studio 2012 Update 1 ALM Virtual Machine Now Available

    • 2 Comments

    The Visual Studio 2012 Update 1 ALM virtual machine and 21 hands-on-labs / demo scripts are now available for download.

    All of the existing hands-on-labs / demo scripts were updated slightly to reflect UI and workflow changes included in Update 1.

    One new lab / demo script was created focusing on new ALM tooling for SharePoint 2010 developers and testers.

    Finally, two existing labs / demo scripts were enhanced to include exercises based on new capabilities included with Update 1.

    The new and updated labs / demo scripts are referenced in the table of scenarios listed on the download page.

    Enjoy!

  • Brian Keller

    Free up disk space after upgrading to Windows 8

    • 1 Comments

    I have been helping friends and family upgrade to Windows 8 lately, and wanted to share one quick tip on how to reclaim several gigabytes of disk space after the upgrade.

    When you upgrade to a new operating system, Windows will store several files related to the upgrade in case you want to uninstall the upgrade or troubleshoot anything which went wrong.

    Most of the time, however, these files can be safely deleted after you have confirmed that the upgrade was successful. You might want to wait a few days after upgrading just to make sure you are happy with the upgrade. Assuming you are, here are the steps you should take to reclaim that disk space.

    1. Right-click on the C: drive and select Properties.

    image

    2. Click on Disk Cleanup.

    image

    3. Click on Clean up system files.

    image

    4. Disk Cleanup will analyze your system again and show you new options for reclaiming drive space. On my machine, I selected Previous Windows installation(s) and Windows upgrade log files. This resulted in a savings of 8.62GB. Click OK to apply changes.

    image

  • Brian Keller

    Understanding the two different flavors of Internet Explorer in Windows 8

    • 9 Comments

    I’ve installed Windows 8 on all of my machines, and I absolutely love it. To cite the tagline: it’s fast, it’s fluid, and it’s Window reimagined.

    Of course there are a few changes that new users will need to understand when they first start using it. The disappearance of the Start button is an obvious one, but I’ve found that’s easily mitigated once you point out to people that you can open the Start screen by pressing the Windows key (if using a keyboard), mouse into the upper-right or lower-right corners (with a mouse), or swipe from the right (if using a touch monitor).

    I believe that the more challenging switch for some users (at least based on my sample group of friends and family who I have helped to upgrade) will be that there are effectively two different flavors of Internet Explorer installed with Windows 8.

    Internet Explorer 10: Internet Explorer 10 is optimized for a touchscreen experience. The enhanced security and reliability model means that it doesn’t support plug-ins, although some popular Flash web sites have been whitelisted to work with this version of Internet Explorer. It’s a beautiful, full-screen browser experience with lots of new features and excellent support for Web standards. You can read a lot more about the features of this browser over at http://www.beautyoftheweb.com/.

    Internet Explorer

    Internet Explorer for the desktop: Internet Explorer for the desktop is also Internet Explorer 10 under the covers, but the look and feel of this browser is like that of previous versions of Internet Explorer. It supports tabbed browsing and plug-ins (like Flash and Silverlight).

    So how do I pick which version I should use?
    Both browsers offer unique benefits. The best part is that you can switch back and forth based on what you are doing. If you have a touch screen monitor and you are surfing the web from the sofa, you’ll likely want to use Internet Explorer 10 to get the full-screen, touch-optimized browsing experience. If you are writing code or planning your wedding, and need to have several windows open alongside web pages, Excel, and Visual Studio, then Internet Explorer for the Desktop provides a great experience for this type of surfing or work.

    What I have noticed, however, is that some users who don’t yet understand the difference between these browsers can get a little confused when they unknowingly switch back and forth between these browser experiences. At Thanksgiving last week I spent some time teaching my friends and family about the difference between browsers and helped them understand under which circumstances each browser will be launched.

    Internet Explorer for the desktop will be launched when you click the Internet Explorer icon from the Windows 8 desktop, or follow a hyperlink from within another desktop application.

     image

    Internet Explorer 10 will be launched if you click the Internet Explorer icon on the Windows 8 start screen, or follow a hyperlink from within any application which was written for WinRT.

     image

    You can override this behavior if you want to (thanks to my friend Joey Snow for the tip!). Open Internet Explorer for the desktop, press Alt+T for the Tools menu, click Internet Options, click Programs, and change the options at the top. The first drop-down controls which flavor of Internet Explorer will be used when you follow links from other programs. The checkbox allows you to determine whether or not the Internet Explorer icon on the start menu will open Internet Explorer on the desktop.

     image

    image

    I hope this blog post helps you hit the ground running with Windows 8 so that you can start enjoying it as much as I do.

  • Brian Keller

    Visual Studio 2012 Update 1 and the ALM Virtual Machine

    • 11 Comments

    December 6, 2012 Update: The virtual machine and corresponding hands-on-labs / demo scripts have been upgraded to use Visual Studio 2012 Update 1. You can download them from here.

    Now that Visual Studio 2012 Update 1 is available, several people have asked whether or not I am updating my ALM virtual machine. The answer is yes – and it will be available by sometime next week. Watch my blog for details. There are some really nice improvements in Update 1 that I think developers, architects, project managers and testers alike will enjoy.

    A longer question I have also been asked is whether or not Update 1 can be installed by end-users into my virtual machine. The answer is “not really” (unless you want to jump through some workaround steps). The reason for this requires a bit longer of an explanation.

    If you have worked with my virtual machine you may have noticed that every time you boot it up, the date and time jumps to May 16, 2012. The reason for this is that in order to show a pseudo-realistic example of how Team Foundation Server can be used to support an actual development team, we need to pin the system date to a specific day in the middle of an iteration. If we didn’t do this, then the VM might look great on the day I shipped it, but if you downloaded it a month later the data is going to start to look stale. You’ll be in some future iteration with no recent work item activity, a flat burndown chart, etc., sort of like any good post-apocalyptic zombie movie where life and routine as we know it stopped months ago.

    Setting your operating system to an older date and time is of course a “hack” that you should never use on your actual Team Foundation Server instance, but since my virtual machine is for training and evaluation purposes I have taken this (and a few other) liberties where necessary to optimize the virtual machine for those experiences.

    One implication of this hack is that after you boot the virtual machine and start working with Team Foundation Server you should never reboot the virtual machine. If you do, then the operating system will reboot into the morning of May 16, 2012, and Team Foundation Server will get confused since you will be going “back in time” – something that Team Foundation Server is simply not designed to support. Instead, I always suggest that users take a Hyper-V snapshot of my virtual machine after they boot it up for the first time but before they start working with it so that they can always roll back to a known clean state in case they make a mistake or simply want to repeat a scenario (which is what I do routinely when I am demonstrating Team Foundation Server at conferences and customer meetings).

    Which brings us to Visual Studio 2012 Update 1. If you try installing Update 1 into my virtual machine you will notice that you are prompted to reboot during the installation process. While you won’t receive any errors or warnings during the setup/upgrade process, if you attempt this you will start to notice problems later on – especially in web access. This is because you are going back in time every time you reboot.

    I know a few people were burned by this and I’m sorry for the time you may have wasted going down this path. Generally speaking, I always tell people that the virtual machine was built specifically to support the nearly two dozen hands-on-labs / demo scripts which go along with it. While you are welcome to use it for other purposes, your mileage may vary, and this is a good example of something which just won’t work.

    One workaround if you really want to install Update 1 yourself into my virtual machine would be to go into the Task Scheduler and disable the task which configures the date and time to May 16, 2012. After you disable this you can run Update 1 as expected, but keep in mind that the project management data will no longer look accurate since you will be many months ahead of when it was designed for. Or, you can wait a week until I publish an official version.

    Thanks for reading and as always for all of the feedback.

  • Brian Keller

    Radio TFS: The one with Brian Keller

    • 3 Comments

    This morning I had the pleasure of being hosted on Radio TFS to talk about a few of my favorite new features of Visual Studio 2012 and Team Foundation Server 2012. We talked about capturing stakeholder feedback, exploratory testing, lab management, and more!

    You can catch the whole show here. Don’t forget to subscribe to Radio TFS for a ton of great new content in each show. And thanks to Greg, Martin, Mickey and Paul for hosting me this morning – it was a lot of fun.

  • Brian Keller

    Important Note: The Visual Studio 2010 ALM Virtual Machine is Expiring Soon

    • 8 Comments

    The Visual Studio 2010 ALM Virtual Machine will stop working on September 10, 2012 and will not be updated. If you are still using that virtual machine, please upgrade to the Visual Studio Visual Studio 2012 RTM ALM virtual machine. The 2012 version is based on final RTM software and includes all of the sample data and hands-on-labs / demo scripts which were available in the 2010 ALM virtual machine.

    The good news is that 2012 virtual machine uses a different build process which effectively gives it an infinite shelf life, since you can retain the original RAR files and extract a fresh copy whenever you need to. That fresh copy can be activated and will work for 180 days.

  • Brian Keller

    Updated: Visual Studio 2012 RTM ALM Virtual Machine and Hands-on-Labs / Demo Scripts

    • 7 Comments

    The Visual Studio 2012 RTM ALM Virtual Machine is now available!

    This new VM replaces the previously available Visual Studio 2012 RC ALM virtual machine to use the final Visual Studio 2012 RTM releases.

     

    This is the most comprehensive ALM virtual machine yet. It includes 20 hands-on-labs / demo scripts. 8 of these labs highlight features/scenarios which are brand new in Visual Studio 2012, and the remaining 12 of these scenarios were upgraded from the older Visual Studio 2010 ALM virtual machine.

     

    Go here to start your downloads and to read more about this release!

  • Brian Keller

    Announcing kanban and git-tf for TFS

    • 1 Comments

    Today we announced the addition of two new capabilities for TFS.

    The first is a new kanban board for Team Foundation Service.

    Kanban is an increasingly popular process used by engineering teams to help ensure that they are providing a continuous stream of value to their customers while limiting the amount of work in progress for any given phase of the engineering lifecycle. Now you can use kanban along with the rest of the agile project management tools already built into Team Foundation Service.

    You can learn more about the new kanban board in my Channel 9 interview with Gregg Boer, a program manager on the TFS team:

    The second new capability is designed to help combine the local repository offered by Git with the integration application lifecycle management solution offered by Team Foundation Server.

    Git-tf is a new cross-platform bridge which was announced today and allows developers to combine the local repository capabilities of Git with the integrated application lifecycle management tooling of Team Foundation Server.

    Now you can use a Git repository locally, and when you're ready to, check in code to TFS. You can even continue to take advantage of integration between work items (such as bugs and requirements) in TFS when you want to enable end-to-end traceability of the relationship between your work and your code changes. This bridge is a cross-platform tool built with Java, so it runs on many operating systems, including OS X, Linux, and Windows. This means that you can use Git clients (such as Xcode) and maintain the ability to check code into Team Foundation Server.

    For more information on git-tf, check out my Channel 9 interview with Matt Mitrik, also a program manager on the TFS team:

     

    You can read more about both of these capabilities over at Brian Harry’s blog:

  • Brian Keller

    Visual Studio 2012 RC ALM DemoMates now available

    • 1 Comments

    The Visual Studio 2012 DemoMates for showcasing application lifecycle management scenarios have been updated based on the RC release. You can download the DemoMates here.

    DemoMates are a nice alternative to the Visual Studio 2012 Virtual Machine for when you don’t have time or hardware resources to run the virtual machine.

  • Brian Keller

    2 New Books: Pro ALM with Visual Studio 2012, and Pro TFS 2012

    • 8 Comments

    I can finally talk about the two new books I have been working on!

    http://tinyurl.com/ALM2012 http://tinyurl.com/ProTFS2012

    Professional Application Lifecycle Management with Visual Studio 2012 covers the full breadth of ALM capabilities available in Visual Studio 2012, Team Foundation Server 2012, and related technologies. This book has something for the entire extended development team – whether you are a project manager, software developer, software tester, architect, manager, or a jack of all trades. Topics covered include:

    • Software development (version control, code review, unit testing, code clone analysis, debugging with IntelliTrace, profiling, suspending and resuming work, and much more)
    • Software testing (Microsoft Test Manager, Web & Load testing, Coded UI testing, Lab Management)
    • Software architecture (Architecture Explorer, Dependency Graph Generation, UML modeling, Layer Diagrams)
    • Project Management (Agile planning & tracking, process templates, reporting)
    • Stakeholder engagement (PowerPoint Storyboarding, Microsoft Feedback Client)
    • Team Foundation Server 2012 (Installing, Configuring, Team Build, Branching & Merging)
    • And much, much more…

    Professional Team Foundation Server 2012 dives deeper into Team Foundation Server 2012 and is intended for anybody who needs to install, administer, or perform advanced configuration tasks with Team Foundation Server 2012:

    • Installation
    • Configuration
    • Topologies
    • Backup
    • Disaster Recovery
    • Customization and Extensibility
    • And much more…

    These books are the follow-up books to the 2010 editions of these titles (which you can still order here and here). The 2012 books have been more than 50% revised to include changes and additions in the 2012 release.

    Both of the 2012 books are available for pre-order now, and are expected to release in the next few months:

    These books are a collaborative effort between myself and my awesome co-authors: Mickey Gousset, Ed Blankenship, Martin Woodward, and Grant Holliday. Together we make up Microsoft employees and Visual Studio ALM MVP’s with a combined total of more than 30 years working in the ALM space with tools such as Visual Studio and Team Foundation Server.

    Thank you to everyone who bought the 2010 books. Your support, feedback, and encouragement made it an easy decision to invest the time and energy into these new editions. I hope you will enjoy them!

Page 3 of 29 (284 items) 12345»