<?xml version="1.0" encoding="UTF-8" ?>
<?xml-stylesheet type="text/xsl" href="http://blogs.msdn.com/utility/FeedStylesheets/rss.xsl" media="screen"?><rss version="2.0" xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:slash="http://purl.org/rss/1.0/modules/slash/" xmlns:wfw="http://wellformedweb.org/CommentAPI/"><channel><title>Project Server 2010: August Cumulative Update package hotfix re-released</title><link>http://blogs.msdn.com/b/brismith/archive/2011/10/18/project-server-2010-august-cumulative-update-package-hotfix-re-released.aspx</link><description>Pink Floyd are not the only ones re-releasing their back catalog this month – we have re-released the SharePoint Foundation 2010 August Cumulative Update.&amp;#160; As this is also contained in the roll-up packages then these too have been re-released.&amp;#160;</description><dc:language>en-US</dc:language><generator>Telligent Evolution Platform Developer Build (Build: 5.6.50428.7875)</generator><item><title>re: Project Server 2010: August Cumulative Update package hotfix re-released</title><link>http://blogs.msdn.com/b/brismith/archive/2011/10/18/project-server-2010-august-cumulative-update-package-hotfix-re-released.aspx#10232394</link><pubDate>Wed, 02 Nov 2011 09:23:37 GMT</pubDate><guid isPermaLink="false">91d46819-8472-40ad-a661-2c78acb4018c:10232394</guid><dc:creator>Maaz Ibrahim</dc:creator><description>&lt;p&gt;Hei Brian,&lt;/p&gt;
&lt;p&gt;Aug 30 CU for Project Server 2010 (projectserver2010-kb2553047-fullfile-x64-glb) saved my life today when i deployed it on my own system. It worked for the issue with the Timesheet (Sending already approved Timesheet without Recalling it, which ultimately produces Failed and blocking correlation error in the queue).&lt;/p&gt;
&lt;p&gt;The issue was that when a user opens an already approved timesheet (having SEM), he can be able to edit it and send it for approval and when the user press Send Timesheet button Error occurs in the timesheet, then user need to delete the timesheet to rectify this error... anyways, this issue wasn&amp;#39;t mentioned in the CU description (might be there but i may not have gone through it)&lt;/p&gt;
&lt;p&gt;My client was asking me to resolve this issue asap. So i tried Aug 30 2011 CU on my system and what i found there is that;&lt;/p&gt;
&lt;p&gt;&amp;quot;If the timesheet is already approved and user opens it and edit it, he/she can&amp;#39;t send/save/insert/import/Reassign/Remove task from it, means that there is no way to do any action on the approved timesheet, coz these buttons are disabled on the ribbon&amp;quot;. &lt;/p&gt;
&lt;p&gt;Now i have to test the other issues with this CU, the one i am facing these days related to Status Updates... &lt;/p&gt;
&lt;p&gt;Brian correct me if i am wrong... &amp;nbsp;&lt;/p&gt;
&lt;div style="clear:both;"&gt;&lt;/div&gt;&lt;img src="http://blogs.msdn.com/aggbug.aspx?PostID=10232394" width="1" height="1"&gt;</description></item></channel></rss>