[UPDATE 11/5/12] I wanted to add that when using either the hierarchy view or the track changeset view, you can use Ctrl-C when the window has focus to get an image of it copied to the clipboard rather than having to use a screenshot tool.
One of the great features in TFS 2010 is the ability to track changesets across branches. A prime user scenario for this feature is determining whether a fix has made it to a particular branch. Here’s an example of how to do that.
How to track a changeset number:
How to track a work item:
If you have a work item that has a changeset link, it’s even simpler. Bring up the work item form, right click on the form, and choose Track Work Item.
Enjoy!
Technorati Tags: branch,tfs,tfs 2010