Welcome to MSDN Blogs Sign in | Join | Help

Browse by Tags

All Tags » Microsoft Project 2010   (RSS)

Project Server 2007 and 2010: Roundup of the week

If you are interested in 2010 then the Product Group blog has a brand new article from Bonny on user controlled scheduling . This covers the ability to turn of the scheduling engine for selected tasks (task type changed from automatically scheduled to

Microsoft Project 2010: Product Group Blog on the new Ribbon

If you haven’t been over to the Product Group blog for a while, now would be a good time.  There is a new look and a new posting on the ribbon in Project 2010 - http://blogs.msdn.com/project/archive/2009/09/24/project-2010-introducing-the-ribbon.aspx
Posted by BriSmith | 2 Comments
 
Page view tracker