January 2007 - Posts
Exchange Load Generator (08.01.0061) February 9, 2007. Perform benchmarking, pre-deployment validation, and stress testing tasks that introduce various types of workloads into a test (non-production) Exchange messaging system. Simulate the delivery of
Read More...
Exchange Server Jetstress (08.01.0038) January 3, 2007. Verify the performance and stability of the disk subsystem before putting the Exchange server into a production environment. • 64-bit download • 32-bit download
Read More...
A: There are two sets of latency thresholds defined in the Jetstress xml configuration file: One is strict for a test short than or equal to 6 hours. The other is lenient for a test longer than 6 hours (it is also called a stress test). Excerped from
Read More...