Visual Studio 2012 Update 1 CTP

Visual Studio 2012 Update 1 CTP

Rate This
  • Comments 28

11/26/2012 Update. 

Note The final release of Visual Studio Update 1 now available, please see:

Visual Studio and Team Foundation Server 2012 Update 1 now available

Also Note the KB of fixes is now available:

http://support.microsoft.com/kb/2797915/EN-US

 

Summary

Visual Studio 2012 Update is providing continuous value to customers, adding new capabilities year-round to features in the main product release. These releases will be aligned with the core software development trends in the market, ensuring developers and development teams always have access to the best solution for building modern applications.

Below you will find the key new features that can be found in the Visual Studio 2012 Update 1 CTP.   This release is a Consumer Technology Preview of the forthcoming Visual Studio Update due out in November.

  • Supporting agile teams: Agile planning along with adding Kanban support to the existing Scrum support.
  • Continuously enabling quality: code coverage for manual testing web apps, easily filter and group your unit tests or a web interface for test cases
  • SharePoint development: add additional ALM capabilities to SharePoint such as Load Testing and Coded UI testing support.
  • Windows development: improving Windows 8 application development, Windows XP for C++ applications without side by side installations.

Please note: as this is a Technology Preview; it is NOT meant to be run on production workstations or servers.  You can install these updates on top of the RTM release of Visual Studio 2012 and going forward, future updates will install correctly on older updates.

New Features in Visual Studio 2012

Below is the list of features found in the Update 1 CTP. Going forward, for more information using these features please see the Visual Studio Team blog

New Test Features in Microsoft Test Manager and Visual Studio

Below is the list of features found in the Update 1 CTP.  Going forward, for more information using these features please see the Visual Studio ALM Team blog

New Features in Team Foundation Server

Below is the list of features found in the Update 1 CTP.  Going forward, for more information using these features please see Brian Harry and the Visual Studio ALM Teams’ blog

Note: The Version controls warehouse still has a 260 character limit and you need to have this update applied to both your Team Foundation Server and Visual Studio client.

 

Downloads

For your convenience you will find the download page for the Visual Studio 2012 Update 1 CTP at:

http://www.microsoft.com/en-us/download/details.aspx?id=34818

 

Statement of Support

Please note: as this is a Technology Preview, it is NOT meant to be run on production workstations or servers.  The testing of these CTPs is not as exhaustive and complete as the testing for the release product.  The recommended approach for upgrading Visual Studio on developer workstations is installing the latest Visual Studio Update 1 CTP on top of the RTM or a previous CTP build.   NOTE: since setup is updating the files during these updates there is NOT a “downgrade” path to get back to a previous release. 

WARNING: Do not install the CTP on a Team Foundation Server Production Server.  Unlike Visual Studio you can NOT upgrade Team Foundation Server once a CTP is applied and you can NOT attach a CTP TFS configuration database (which contains the Source, Work Items etc) to a released version of Team Foundation Server.

 

The installer available for the Visual Studio 2012 Update may also be used to download and create a disk layout that will include updates for all of the Visual Studio clients. To create this layout:

  1. Download and save the installer
  2. Run the installer from a command prompt with flag: /layout
  3. Specify the download location in the UI.

How to Provide Feedback on this Release

Feedback is an important part of this process. To supply feedback, please use the Visual Studio 2012 feedback tool. For your convenience the feedback tool automatically captures the build number and attaches system information - so we know any bugs/suggestions are for this technology preview.

Leave a Comment
  • Please add 6 and 7 and type the answer here:
  • Post
  • @Bjorn: First, sorry you hit this issue.  We'll likely need to find out more about your environment to figure out why this is happening.  Can you contact me at taylaf (at) microsoft (dot) com so that we can get some more information from you?

    Thanks,

    Taylor

  • Can you please publish a post about the load testing, coded UI, and IntelliTrace improvements for SharePoint? Can we now also get code coverage for SharePoint manual tests via MTM? If so, how should symbol paths be set to a symbol server for a team build, etc? This is for me by far the most exciting new feature.

  • connect.microsoft.com/.../find-shelvset-problem

  • Awe, I was really hoping to get Variadic Templates.  This change seems to not really have any new C++ stuff, so I assume it won't cause any C++ ABI breakages.

  • @DRayX, check out the announcement on the Visual C++ Blog, blogs.msdn.com/.../10357555.aspx.

  • Sorry for my English, i'm from Russia :) Can't update VS with Proxy! Maybe you add "vsupdate_kb2707250.ISO" as is done when loading Visual Studio?

  • After installing this udate, I am no longer able to check in files to TFS using Visual Studio. The following error message is immediately displayed (in the Team Explorrer pane, under the "Pending Changes" title):

    "Unable to handle request without a valid action parameter. Please supply a valid soap action."

    This issue is affecting multiple users from my organisation (all of them have installed the patch). I have so far been unable to find any help regarding this error, and repairing and completely re-installing Visual Studio 2012 hasn't helped either.

    Is anyone else experiencing this problem, or can anyone lend some advice on where to look for a solution?

  • Hello Nick,

    I am assuming are installing the current CTP at: http://www.microsoft.com/en-us/download/details.aspx?id=34818

     

    Also this is not a patch - yet, it is a community preview.  

    In either case can you contact me at Chass@Microsoft.com?

    Thanks,

    Chuck

  • I have same problém like BjornEriksson:  

    TF255136: The data for applying the service pack or critical update could not be added to the server.

  • @Nick Larter:   Did you get the issue solved. I have the exact same problem. Can't check in to TFS after having installed VS2012 update 1.

    Error: Unable to handle request without a valid action parameter. Please supply a valid soap action.

    Any help is appreciated

  • Links to download page are broken.  I have a VM I want to update and am looking for the files.  The VM does not have internet access so it needs to be all files required to update does the download page have this?  Thanks.

  • Hello Murphy,

    The CTP downloads have been taken down as the final release is finished.

    Please see

    blogs.msdn.com/.../visual-studio-and-team-foundation-server-2012-update-1-now-available.aspx.

    For machines with no network access you can use the /Layouts switch to get all the files locally

    Thanks

    Chuck

  • Thanks Charles. This worked.  The switch is /Layout instead of /Layouts.  Below post had more info on this.

    visualstudio.uservoice.com/.../3378035-standalone-installer-for-vsupdate-kb2707250-exe-wo

Page 2 of 2 (28 items) 12